Back to List

Westinghouse - MPH1

Head Drawing

diagram

Other Versions

No other drawings

Installation Locations in N. America

Installation Location

Cylinder Notes

  • Easily confused with Schindler MPH2 which has been manufactured since 1989. Notice outside cylinder head wall is much longer than MPH2.
  • Remove & inspect bottom striker plate in cases of plunger damage
  • There are (4) grooves on OD packing sleeve. ONLY (2) are O Ring grooves. Grooves with port holes are NOT for O Rings.

Packing Sets

Plunger Diameter Packing Set number
3-1/2 9EA025-01
3-3/4 9EA025-02
4 9EA025-03
4-1/2 9EA025-04
5-1/2 9EA025-05
6 9EA025-06
6-1/2 9EA025-07
7 9EA025-08
8 9EA025-09

Packing Notes

  • 3rd O Ring is to be positioned on OD groove in bottom striker plate if it is removed

Packing Set Contents

Wiper
Seal
Lantern Bearing
Seal
O RIng
O Ring
O Ring

Packing Alternatives

Call if you have one of these extreme conditions
Condition Recommendation
Rough Ride / Friction Rough Ride / Friction 800 Series
Requires Split Seal Requires Split Seal 800 Series
Damaged Plunger Damaged Plunger 600 Series